MSD Ballydine Internal Architectural Finishes Package

Scope

The goal of this project was to create a suitable and modern pharmaceutical environment, while ensuring the safety of the tenants. The installation of fire rated partitions, epoxy and vinyl floors, steel fire doors, fireproofing, and secondary steel fabric finishes.

Challenges

Working within the existing live building.
Working around live services.
Working within cleanroom areas .
Logistics – limited laydown space was available, which resulted in the necessity of “just in time” deliveries.

 

 

Project Duration:

39 weeks

Architect:

PM Group

QS Consultant

PM Group

Project Value

€ 19,000,000