Scope
Demolition of the existing showroom, replaced by an entirely new structure, complete with steel frame structure, glazed curtain walling, new mezzanine floor and all associated M&E.
Innovations
Environmental sustainability was at the forefront of this project. The demolished concrete was crushed for re-use to use as fill under roadways to minimize our carbon footprint, as well as incorporating a green roof system.
Additional Information
At the time of completion, this was the largest Mercedez showroom in Europe.
Check out our timelapse video below of the build project!
December 2017
11 months
EMD Architects
DBFL
ADCO Contracting